TABLE OF CONTENTS

ELECTRIC AND ELECTRONIC EQUIPMENT 4 PROJECTS
AGRICULTURE 15 PROJECTS
AQUA-CULTURE 9 PROJECTS
CHEMICAL AND FERTILISER 14 PROJECTS
FORESTRY
PAPER 3 PROJECTS
PHARMACEUTICAL INDUSTRY AND MEDICAL EQUIPMENT 9 PROJECTS
STEEL 2 PROJECTS
TRANSPORTATION 11 PROJECTS
TOURISM-SERVICES 4 PROJECTS
TELECOMMUNICATION 3 PROJECTS
MECHANIC AND ENGINEERING : 7 PROJECTS

 

 

 

 

 

 

 

 

VIEW & PRINT LIST OF ALL

 

TABLE OF CONTENTS

ELECTRIC AND ELECTRONIC EQUIPMENT 4 PROJECTS
AGRICULTURE 15 PROJECTS
AQUA-CULTURE 9 PROJECTS
CHEMICAL AND FERTILISER 14 PROJECTS
FORESTRY
PAPER 3 PROJECTS
PHARMACEUTICAL INDUSTRY AND MEDICAL EQUIPMENT 9 PROJECTS
STEEL 2 PROJECTS
TRANSPORTATION 11 PROJECTS
TOURISM-SERVICES 4 PROJECTS
TELECOMMUNICATION 3 PROJECTS
MECHANIC AND ENGINEERING : 7 PROJECTS

 

MECHANIC AND ENGINEERING : 7 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 11 (Back to Table of Contents)

1 Name of Project: Factory for manufacturing vehicle's spare parts and other industries
2 Objective: 3 Location: Cam Pha Province-Quang Ninh province
4 Capacity: 1000 tones/year
5 Production and/or services: Production:
- Spare parts for vehicle: 100 tones/year
- Spare parts for mining machines: 500 tones/year (tunnel and open cast mine)
- Spare parts for screen plants, ports and railway: 350 tones/year
- Spare parts for other purposes: 50 tones/year
6 Market: - 30% for local market
- 70% for export
7 Main technology: Updated complete line
8 Employment: 300 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $8 million
Legal capital: $3.8 million
Vietnam contribution: 30-40%

 

PROJECT NO. 13 (Back to Table of Contents)

1 Name of Project: Assembling construction equipment and machines Factory
2 Objective: Cooperation to assembling construction machines and equipment
3 Location: Cam Pha Town-Quang Ninh Province
4 Capacity: 620 units/year
5 Production and/or services: Assembling construction machines and equipment: 370 trucks/year
6 Market : - 30% for local market
- 70% for export
7 Main technology:
8 Employment: 250 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $14 million
Legal capital: $6.3 million
Vietnamese Party: 30-40 %

 

PROJECT NO. 14 (Back to Table of Contents)

1 Name of Project: Manufacturing equipment for fresh concrete
2 Objective: Manufacturing, assembling: Concrete mixer station, fresh concrete pump, vehicle for fresh concrete transportation
3 Location: Cam Pha Town- Quang Ninh Province
4 Capacity: 21,000 tones/year
5 Production and/or services: Manufacturing, assembling concrete mixer station - Manufacturing, assembling fresh concrete pump - Manufacturing, assembling vehicle for fresh concrete transportation.
6 Market : 30% for local market 70 % for export
7 Main technology: Complete line for manufacturing, assembling: concrete mixer station, fresh concrete pump, vehicle for fresh concrete transportation: casting (forging and structure), cutting, heat treatment, group assembling, testing, general assembling, general Q.C, packing and storing.
8 Employment: Proposed 500 employees
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $54 million Legal capital: $25.3 million 30-40% from Vietnam Party

PROJECT 16 (Back to Table of Contents)

1 Name of Project: Electric Motor Manufacturing
2 Objective: Manufacturing explosive safety electric motor with power ratings from 0.75 to 30KW
3 Location: Cam Pha Town, Quang Ninh Province
4 Capacity: Manufacturing explosive safety electric motor: 0.75-30KW 1,000 units/year
5 Production and/or services: Manufacturing explosive safety electric motor with power ratings from 0.75 to 30 KW, to be upgraded from Vietnamese ordinary electric motor 2 K and 4K
6 Market : 50% for local market 50% for export
7 Main technology: Group assembling and testing Complete assembling, general Q.C Packing, Storing
8 Employment: Proposed 100 employees
9 Investment form: Joint-venture or import technic and equipment
10 Proposed Investment Capital: Total capital: $9 million Legal capital: $4.3 million 50% from Vietnamese Party

PROJECT 17 (Back to Table of Contents)

1 Name of Project: Manufacturing small diesel engines
2 Objective: Supplying to agricultural works, transportation means in rural area, boats
3 Location: Hanoi or some provinces in the North of Vietnam
4 Capacity: 30,000 units/year
5 Production and/or services: - Small diesel engine with power range of 8-9-12-15-18-20-35 HP - Services after sale
6 Market : Domestic market, export to the countries in ASEAN, Southern Asia, Africa and Southern America.
7 Main technology: Foundry, forging-stamping, heat treatment and machining
8 Employment: 2,000 persons
9 Investment form: joint-venture or Business cooperation contract
10 Proposed Investment Capital: - Total capital: $30 million - Legal capital: 15 million

PROJECT NO. 21 (Back to Table of Contents)

1 Name of Project: A factory for assembling, repairing, maintaining KAMAZ trucks
2 Objective: Assembling, repairing, maintaining KAMAZ truck with capacity of 12 tones
3 Location: Cam Pha Town, Quang Ninh Province
4 Capacity: Assembling, repairing, maintaining KAMAZ truck and equivalent to truck with loading capacity up to 12 tones: Factory capacity is 500 trucks/year
5 Production and/or services: - Assembling, repairing, maintaining KAMAZ truck: 250 trucks/year - Assembling, repairing, maintaining equivalent truck with loading capacity of 12 tones: 250 trucks/year
6 Market : - 30% for local market - 70% for export
7 Main technology: Assembling, repairing, maintaining KAMAZ and equivalent to truck with loading capacity from 10 to 12 tones
8 Employment: proposed 500 employees
9 Investment form: Joint-venture or Business Cooperation Contract
10 Proposed Investment Capital: Total capital: $12 million Legal capital: $ 5.4 million 50 % from Vietnamese Party

PROJECT NO. 19 (Back to Table of Contents)

1 Name of Project: Heavy Industry Production: Overweight, overlong equipment
2 Objective: Manufacture overweight, overlong equipment for complete line in many industries: Mining, power, construction material (cement), forest and agriculture production (sugar-cane mills), transportation (heavy lifting equipment).
3 Location: Cam Pha Town, Quang Ninh province
4 Capacity: 21,000 tones/year
5 Production and/or services: - Technical equipment in cement production line with capacity of 200,000-300,000 tones/year: Clinker ball grinding machine: 50 tones/hour; Horizontal rotate clinker furnace with dia up to 3,000 mm, length of approximately 50m, Heavy-duty speed reducer, in
6 Market : 50% for local market 50% for export
7 Main technology: Complete production and assembling line: Casting, forming forging, pressing, structure, cutting, heat treatment, group assemble, general assemble and testing, packing and storing.
8 Employment: proposed 500 employees
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $68 million Legal capital: $31.9 million 50% from Vietnamese Party

ELECTRIC AND ELECTRONIC EQUIPMENT 4 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 27 (Back to Table of Contents)

1Name of Project:High-tech Medical Equipment Plant
2Objective:Establishing a plant to produce High-tech Medical Electronic Equiment .
3Location:Hanoi, Hai Phong city
4Capacity:to be specified by investors
5Production and/or services:High-tech Medical Electronic Equipment using digital technique in diagnosing and treatment, producing application software for medical equipment and some medica electronic parts
6Market :Export: 50%
7Main technology:Ultrasound technique, digital technique
8Employment:150
9Investment form:Joint-venture or 100 foreign owned capital
10Proposed Investment Capital:Total investment capital: $5 million

 

PROJECT NO. 28 (Back to Table of Contents)

1Name of Project:Magnetic Material and Component Plant
2Objective:Establishing a plant to produce hard and soft magnetic materials, magnetic products
3Location:Hanoi, Hai phong city
4Capacity:2,000 tones/year
5Production and/or services:Ferrite Powder: 1,000 tones/year - Soft ferrite powder: 1,000 tones/year - Cores for DY, FBT and transformer; other specified magnetic products: 10,000,000 pcs/year.
6Market :Export: 50%
7Main technology:Grinding and burning technology
8Employment:200 persons
9Investment form:Joint-venture or 100 foreign owned capital
10Proposed Investment Capital:Total investment capital: $10 million

PROJECT NO. 32 (Back to Table of Contents)

1Name of Project:Component Manufacturing and Computer Assembling Plant
2Objective:Establishing a plant to assemble PC
3Location:Hanoi, Hai Phong, Ho Chi Minh city
4Capacity:120,000 units/year
5Production and/or services:Assemble main boards, cards for computers, power supply, mechanic and plastic parts for PCs, assemble PCs
6Market :Export: 50%
7Main technology:Assembling technology
8Employment:120 employees
9Investment form:Joint-venture or 100 foreign owned capital
10Proposed Investment Capital:Total Investment capital: $7 million

PROJECT NO. 30 (Back to Table of Contents)


1Name of Project:CD-DVD Manufacturing Plant
2Objective:Establishing a plant to produce CD, DVD, CD-ROM
3Location:Hanoi, Hai Phong city
4Capacity:- CD, CD-ROM: 6 million units/year - DVD: 3 million units/year
Time size=3>Capacity:- CD, CD-ROM: 6 million units/year - DVD: 3 million units/year
5Production and/or services:CD, DVD, CD-ROM
6Market :Export: 85%
7Main technology:Produce single and double disks
8Employment:50 employees
9Investment form:Joint-venture or 100 foreign owned capital
10Proposed Investment Capital:Total investment capital: $6 million

AGRICULTURE 15 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 142a (Back to Table of Contents)

1 Name of Project: Producing and processing zone for vegetable & fruit
2 Objectives:
3 Location: Dong Giao district, Ninh Binh province, 100km South from Hanoi
4 Capacity: 30,000 tonnes of products per year with international standard
5 Production: - 15,000 tonnes of canned vegetables & fruits: pineapple, baby corn, mushroom. - 15,000 tonnes of fruit juice: pineapple, coconut, custard-apple, lychee, longan...
6 Market: 50% of products for export
7 Main technology: Up-dated technology for processing vegetables and fruits
8 Employment: 90-100 employees
9 Investment Form : Joint-venture or Business co-operation contract
10 Investment capital: - Total capital: $ 8 million - Legal capital: $ 4 million

PROJECT NO. 142b (Back to Table of Contents)

1 Name of Project: Producing and processing zone for vegetable & fruit
2 Objectives:
3 Location: Quang Ngai town, Quang Ngai province
4 Capacity: 25,000 tonnes of products per year with international standard
5 Production: - 10,000 tonnes of canned fruits - 15,000 tonnes of fruit juice: pineapple, coconut, mango, sugar-can...
6 Market: 50% of products for export
7 Main technology: Up-dated technology for processing vegetables and fruits
8 Employment: 60-70 employees
9 Investment Form : Joint-venture or Business Co-operation Contract
10 Investment capital: - Total capital: $ 5 million - Legal capital: $ 3 million

PROJECT NO. 144 (Back to Table of Contents)

1 Name of Project: Bac Giang processing factory for canned fruit & fruit juice
2 Objectives:
3 Location: Bac Giang province, 50km North from Hanoi
4 Capacity: 25,000 tonnes of products per year with international standard.
5 Production: - 5,000 tonnes of canned fruits: lychee, longan, pineapple, mushroom. - 20,000 tonnes of fruit juice: pineapple, custard-apple, lychee, longan...
6 Market: 50% -60% of products for export
7 Main technology: Up-dated technology for processing vegetables and fruits
8 Employment: 90-100 employees
9 Investment Form : Joint-venture or Business co-operation contract
10 Investment capital: - Total capital: $ 8 million - Legal capital: $ 4 million

PROJECT NO. 145A (Back to Table of Contents)

1 Name of Project: Can Tho processing factory for fruit juice
2 Objectives: - Development material area; - Construction a processing factory to produce canned and concentrated fruit juice; - Trading activities involved.
3 Location: Can Tho province
4 Capacity: 25,000 tonnes of products per year with international standard
5 Production: - 5,000 tonnes of canned pineapple fruit - 20,000 tonnes of concentrated fruit juice (50% of coconut, 50% of orange juice concentrated at 60o Brix)
6 Market: 50% -60% of products for export
7 Main technology: Up-dated technology for processing fruit juice
8 Employment: 90-100 employees
9 Investment Form : Joint-venture or Business co-operation contract
10 Investment capital: - Total capital: $ 8-10 million - Legal capital: $ 4 -5 million

PROJECT NO. 145b (Back to Table of Contents)

1 Name of Project: Kien Giang processing factory for fruit juice
2 Objectives: - Development material area; - Construction a processing factory to produce canned and concentrated fruit juice; - Trading activities involved.
3 Location: Kien Giang province
4 Capacity: 25,000 tonnes of products per year with international standard
5 Production: - 5,000 tonnes of canned pineapple fruit - 20,000 tonnes of concentrated fruit juice (50% of coconut, 50% of orange juice concentrated at 60o Brix)
6 Market: 50% -60% of products for export
7 Main technology: Up-dated technology for processing fruit juice
8 Employment: 90-100 employees
9 Investment Form : Joint-venture or Business Co-operation Contract
10 Investment capital: - Total capital: $ 8-10 million - Legal capital: $ 4 -5 million

PROJECT NO. 146 (Back to Table of Contents)

1 Name of Project: Processing Factory of Instant Coffee for export
2 Objectives:
3 Location: Ho Chi Minh city
4 Capacity: Processing 20,000 tonnes of products per year with International standards
5 Production: Instant coffee including packed and canned coffee
6 Market: Over 80% of products for export
7 Main technology: Up-dated technology for processing of coffee
8 Employment: 40 - 50 Employees
9 Investment Form : Joint - Venture or Business Co-operation Contract
10 Investment capital: - Total Capital: $ 15 million - Legal Capital: $ 5-7 million

PROJECT NO. 147 (Back to Table of Contents)

1 Name of Project: Plantation & Processing of Arabica Coffee for export
2 Objectives: - Plantation of Arabic Coffee; - Contraction of processing factory to produce powder and instant coffee; - Trading activities involved.
3 Location: Dak Lak or Lam Dong Provice
4 Capacity: - Plantation 8,000-10,000 ha Arabica Coffee; - Processing 20,000 tonnes of International standard products per year (19,000 tonnes of meal & 1,000 tonnes of instant coffee)
5 Production: Powder coffee, packed & canned coffee
6 Market: Over 80% of products for export
7 Main technology: Up-dated technology for processing of coffee
8 Employment: 2,000 Employees
9 Investment Form : Joint - Venture or Business Co-operation Contract or 100% of FDI
10 Investment capital: - Total Capital: $ 40 million - Legal Capital: $ 20 million

PROJECT NO. 149 (Back to Table of Contents)

1 Name of Project: Processing factory of shelled pepper for export
2 Objectives:
3 Location: Binh Phuoc province
4 Capacity: 4,000 - 5,000 tonnes of International standard products per year
5 Production: Processing pepper for export
6 Market: Over 90% of products for export
7 Main technology: Up-dated technology for processing of pepper
8 Employment: 45-50 employees
9 Investment Form : Joint - Venture or Business Co-operation Contract
10 Investment capital: - Total Capital: $ 4-5 million - Legal Capital: $ 2-3 million

PROJECT NO. 150 (Back to Table of Contents)

1 Name of Project: Plantation & processing cashew nut for export
2 Objectives:
3 Location: Tuy Hoa district, Phu Yen Province
4 Capacity: - Plantation 7,000-10,000 ha cashew nut - Processing 30,000 tonnes of International standard products per year
5 Production: - Cashew nut : 20,000 tonnes - Intensively processed products of cashew nut: cashew nut sweets, cake, confections, preserves : 10,000 tonnes
6 Market: 70 - 80% of products for export
7 Main technology: Up-dated technology for processing of cashew nut
8 Employment: 150 - 200 Employees
9 Investment Form : Joint - Venture or Business Co-operation Contract
10 Investment capital: - Total Capital: $ 8-10 million - Legal Capital: $ 3-5 million

PROJECT NO. 151 (Back to Table of Contents)

1 Name of Project: Processing factory of concentrated tomato
2 Objectives: - Supplying credit to develop material area : Hai phong, Quang Ninh, Hai Duong, Hung Yen, Thai Binh, Nam Dinh; - Contruction of processing factory to produce concentrated tomato using domestic material; - Trading activities involved
3 Location: Hai Phong city
4 Capacity: Factory processing 100-150 tonnes of raw material per day
5 Production: Concentrated tomato at 30o Brix
6 Market: 50% products for export
7 Main technology: Up-dated technology for processing of this product
8 Employment: 45-50 employees
9 Investment Form : 100% of FDI, Joint - Venture or Business Co-operation Contract
10 Investment capital: - Total Capital: $ 4-5 million - Legal Capital: $ 2-3 million

PROJECT NO. 157a (Back to Table of Contents)

1 Name of Project: Pig farming & meat processing for export
2 Objectives: to set up an enterprise of pig farm (for sows/fattening pigs) and a slaughterhouse to process pork meat for domestic and export
3 Location: Dong Trieu district, Quang Ninh province, 150km North- East from Hanoi
4 Capacity: Keep and slaughter 20,000-30,000 fattening pig/year (which need 1,100 - 1,700 sows to farm) slaughterhouse output is 70-100 MT live-weight per day
5 Production: 13,000 - 20,000 MT pork meat product per year
6 Market: 50 - 70% products for export
7 Main technology: The most advanced technology for sow and fattening pig farming and for slaughter house equipment
8 Employment: 200-250 employees
9 Investment Form : Joint - venture
10 Investment capital: - Total capital: $ 5 million - Legal capital: $ 3 million

PROJECT NO. 158 (Back to Table of Contents)

1 Name of Project: Processing factory of fish meal for cattle feed
2 Objectives: - Construction factory for processing fish meal; - Supplying equipment to catch fishes; - Processing high quality fish meal for cattle feed; - Trading activities involved
3 Location: In the Northern or South-western provinces of Vietnam
4 Capacity: 45,000-50,000 tonnes of products/ year with international standard
5 Production: Packed fish meal to substitute importing goods
6 Market: Domestic consumption
7 Main technology: Up-dated technology in processing fish meal- steam and dry
8 Employment: 2,000-3,000 employees
9 Investment Form : Joint - venture
10 Investment capital: - Total capital: $ 20 million - Legal capital: $ 8-10 million

PROJECT NO. 159 (Back to Table of Contents)

1 Name of Project: Farming pedigree chicken for meat
2 Objectives: Set up an Arbor Acres heavy breed G.P.S farm to produce a day old chiken parent stock estimating to cover about 25% of the demand of meat type parent stock chicken (P.S) in VN by 2005
3 Location: Bavi district, Ha Tay province
4 Capacity: Maximum to keep yearly an average of 15,000 - 20,000 female line females
5 Production: 200,000-300,000 D.O.C of PS female line (primary product) yearly by first 2-3years, then step by step up to maximum capacity 600,000-800,000 D.O.C
6 Market:
7 Main technology: The most advanced technology for farming of grand parent stock chicken
8 Employment: 100 employees
9 Investment Form : Joint-venture or Business Co-operation Contract
10 Investment capital: - Total capital: $ 5 million - Legal capital: $ 3 million
11.Total capital: $ 5 million - Legal capital: $ 3 million

PROJECT NO. 160 (Back to Table of Contents)

1 Name of Project: Farming Kabir strain coloured feather chicken for meat and egg
2 Objectives: Set up a farm to keep Kabir coloured feather chickens G.P.S to produce day old chick parent stock covering about 30% this type of parent stock chicken (PS) market demand in VN by 2005
3 Location: Nam Truc district, Nam Dinh province, 150km South-East from Hanoi
4 Capacity: Maximum to keep an average of 8,000-10,000 female line females per year
5 Production: 320,000-400,000 D.O.C of PS female line
6 Market: domestic consumption
7 Main technology: The most advanced technology for farming of grand parent stock chicken
8 Employment: 60-70 employees
9 Investment Form : Joint-venture or Business Co-operation Contract
10 Investment capital: - Total capital: $ 4- 5 million - Legal capital: $ 2-3 million

PROJECT NO. 162 (Back to Table of Contents)

1 Name of Project: Farming pedigree duck and processing duck -meat and feather
2 Objectives: Set up an enterprise of duck farm (for parent stock/fattening duck) and a slaughterhouse to produce duck-meat and by-products
3 Location: Cam Binh district, Hai Duong province, 50 km East from Hanoi
4 Capacity: - Keep and slaughter 2,000,000 -3,000,000 fattening ducks per year
5 Production: 4,000 - 6,000 MT duck meat product per year and by-products
6 Market: 50%-70% products for export
7 Main technology: The most advanced technology for duck farming and slaughter equipment's
8 Employment: 200-250 employees
9 Investment Form : Joint-venture or Business Co-operation Contract
10 Investment capital: - Total capital: $ 4-5 million - Legal capital: $ 2-3 million

AQUA-CULTURE 9 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 172 (Back to Table of Contents)

1 Name of Project: High quality fish seed production
2 Objective: - Building and upgrading available basic to produce seed; - Apply new technology in seed production for business; - Operate services in supplying seed.
3 Location: Thanh Liet-Thanh Tri District-Hanoi
4 Capacity: 100 million seeds/year
5 Production and/or services: Fish seeds and others
6 Market : Domestic consumption and export
7 Main technology:
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital: $1 million

PROJECT NO. 173A (Back to Table of Contents)

1 Name of Project: Potential exploitation of Hanoi lakes
2 Objective: Building and upgrading available basic for aquaculture in Ha noi lakes, combine with Tourism and Services
3 Location: Whole Ho Tay lake or others in Hanoi
4 Capacity: According to scale suitable with capital of investor
5 Production and/or services: Seed production and culture other services for business combine with Tourism and Services.
6 Market : Domestic consumption mainly
7 Main technology: Update
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital: $500,000-$3 million

PROJECT NO. 174 (Back to Table of Contents)

1 Name of Project: Culture fish in cage in Ha Tinh reservoir
2 Objective: Making cages for culturing in reservoir
 Making cages for culturing in reservoir
3 Location: Ke Go lake and Song Rac lake, Cam Xuyen district, Ha Tinh province
4 Capacity: 200-500 cages with 9-12 m2/cage
5 Production and/or services: Fresh fish suitable with local environment
6 Market : Domestic consumption and export
7 Main technology:
8 Employment:
9 Investment form: joint-venture or 100 % foreign owned capital
10 Proposed Investment Capital: $2 million

PROJECT NO. 174 (Back to Table of Contents)

1 Name of Project: Culture and capture fish in Nui Coc Lake - Thai Nguyen province
2 Objective: Making cage for culturing, producing fisheries, doing business
3 Location: Nui Coc Lake, Thai Nguyen province
4 Capacity: 50 cages with 9-12m2/ cage Total area of lake: 2500 ha Ability capture: 500 tones fish/year
5 Production and/or services: Fresh fish suitable with local environment
6 Market : Domestic consumption and Export
7 Main technology:
8 Employment:
9 Investment form: joint-venture or 100% foreign owned capital
10 Proposed Investment Capital: $5million

PROJECT NO. 174 (Back to Table of Contents)

1 Name of Project: Culture and capture fish in Cam Son Lake - Bac Giang province
2 Objective: Making cage for culturing, producing fisheries, doing business
3 Location: Cam Son Lake, Bac Giang province
4 Capacity: 50 cages with 9-12m2/ cage Total area of lake: 2700 ha With the beautiful scenes for tourism
5 Production and/or services: Fresh fish suitable with local environment
6 Market : Domestic consumption and Export
7 Main technology:
8 Employment:
9 Investment form: joint-venture or 100% foreign owned capital
10 Proposed Investment Capital: $4 million

PROJECT NO. 175 (Back to Table of Contents)

1 Name of Project: Upgrading two available processing factories in Rach Gia, Kien Giang Province
2 Objective: Upgrading two available fishery processing factories in Rach Gia
3 Location: Rach Gia, Kien Giang province
4 Capacity: - Frozen processing: 4500 tones/year - Frozen store: 360 tones.
5 Production and/or services: High Instant seafood
6 Market : Export mainly
7 Main technology: Upgrading available processing factory, high technology chain equipment investment gradually. High quality products for export to Europe and Northern America Market.
8 Employment:
9 Investment form: joint-venture or 100% foreign owned enterprise
10 Proposed Investment Capital: $3 million

PROJECT NO. 175b (Back to Table of Contents)

1 Name of Project: Upgrading Fish powder production and food for shrimp factory in Da Nang Province
2 Objective: Upgrading available ofd food for shrimp factory, high technology equipment investment for high quality fish powder production and food for shrimp
3 Location: Da Nang City
4 Capacity: 1500 tones fish powder and 1050 tones fish oil/year
5 Production and/or services:
6 Market : - Export: Fish powder: 50%; fish oil: 100% - Domestic consumption: fish powder: 50%
7 Main technology: Update
8 Employment:
9 Investment form: Joint-venture or 100% foreign owned capital
10 Proposed Investment Capital: $3 million

CHEMICAL AND FERTILISER 14 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 36 (Back to Table of Contents)

1 Name of Project: Polystyrene Project
2 Objective: Building Polystyrene Plant
3 Location: Dinh Vu Industrial Zone, Hai Phong City
4 Capacity: 30,000 MT/year
5 Production and/or services: Producing and operating of PS
6 Market : For domestic market and export
7 Main technology: Using the modern technology
8 Employment: about 70 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $23 million Legal capital: $6.9 million

PROJECT NO. 37 (Back to Table of Contents)

1 Name of Project: Polypropylen Project No.2
2 Objective: Building Polypropylen Plant No.2
3 Location: In the Middle or in the South of Vietnam
4 Output 260,000 MT/year
5 Production and/or services: Producing and operating of PS
6 Market : For domestic market and export
7 Main technology: Using the modern technology
8 Employment: about 180 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $212 million Legal capital: not defined by now

PROJECT NO. 38 (Back to Table of Contents)

1 Name of Project: Polypropylen Project
2 Objective: Building Polypropylen Plant
3 Location: Dung Quat Industrial Zone
4 Output 110,000 MT/year
5 Production and/or services: Producing and operating of PP
6 Market : For domestic market and export
7 Main technology: Using the modern technology
8 Employment: about 95 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $93 million Legal capital: $28 million

PROJECT NO. 42 (Back to Table of Contents)

1 Name of Project: Styrene Monomer Project
2 Objective: Building a Styrene Monomer Plant
3 Location: In the Middle of Vietnam
4 Output 210,000 MT/year
5 Production and/or services: Producing and doing business of Styrene Monomer
6 Market : For domestic market and export
7 Main technology: Using the modern technology
8 Employment: about 245 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: $200 million

PROJECT NO. 43 (Back to Table of Contents)

1 Name of Project: Phosphorus Project
2 Objective: Building a Phosphorus Plant
3 Location: Lao Cai Province
4 Output 30,000 MT/year of products
5 Production and/or services: Producing and doing business of phosphorus
6 Market : For domestic market and export
7 Main technology: Using the modern technology
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital:

PROJECT NO. 44 (Back to Table of Contents)

1 Name of Project: Welding Electrode Project
2 Objective: Building a welding electrode Plant
3 Location: Ha Tay Province
4 Output 20,000 MT/year of products
5 Production and/or services: Producing and doing business of welding electrode and related products
6 Market : For domestic market and export
7 Main technology: Using the modern technology
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital:

PROJECT NO. 45 (Back to Table of Contents)

1 Name of Project: Acid Phosphoric Project
2 Objective: Building a Acid Phosphoric Plant
3 Location: Lao Cai Province
4 Output 450,000 MTY of products
5 Production and/or services: Producing and doing business of Acid phosphoric and related products
6 Market : For domestic market and export
7 Main technology: Using the modern technology
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital: $350 million

PROJECT NO. 53 (Back to Table of Contents)

1 Name of Project: BR, SBR Project
2 Objective: Building a BR, SBR Plant
3 Location: In the middle or in the South of Vietnam
4 Capacity: BR: 40,000 MT/year; SBR: 50,000 MT/year
5 Production and/or services: Â Â Producing and doing business of BR and SBR and related products
6 Market : For domestic market
7 Main technology:
8 Employment: about 180 person
9 Investment form: Joint-venture
10 Proposed Investment Capital: BR: $110 million; SBR: 80 million

PROJECT NO. 50 (Back to Table of Contents)

1 Name of Project: DAP Project
2 Objective: Building a DAP Complex
3 Location: Â3. Location: Â Â Dien Cong Village, Yen Hung District, Quang Ninh Province
4 Capacity: Â Â 3300 MT/year of products
5 Production and/or services:Â Â Producing and doing business of DAP Fertilizer and related products
6 Market : Â Â For domestic market
7 Main technology: - For H2SO4 Plant with the capacity about 400.000 MT/year: By double absorption Method - For H2PO4 Plant with the capacity about 150.000 MT/year: by Hemi-dehydrate Technology - For DAP Plant with the capacity of 330.000 MT/year : by Pipe Reactor
8 Employment:about 590 persons
9 Investment form: To be invested by VINACHEM. The project is called for foreign financing support
10 Proposed Investment Capital: $243 million

PROJECT NO. 47Â (Back to Table of Contents)

1 Name of Project: Cracking Naphtha Project
2 Objective: Building a cracking naphtha Plant
3 Location: Â In the middle of Vietnam
4 Output 550,000 MTY of products
5 Production and/or services:Â Â Producing and doing business of cracking naphtha and related products
6 Market : Â Â For domestic market and export
7 Main technology: Â Â Using the modern technology
8 Employment: Â Â about 445 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: $812 million

PROJECT NO. 46 (Back to Table of Contents)

1 Name of Project: Soda Project
2 Objective: Building a Soda Plant
3 Location: Thanh Hoa Province
4 Output 100,000 MT/year of products
5 Production and/or services: Producing and doing business of soda and related products
6 Market : For domestic market
7 Main technology: Using the modern technology
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital:

PROJECT NO. 51 (Back to Table of Contents)

1 Name of Project: Automotive Tire Project
2 Objective: Producing high quality automotive tire
3 Location: Kim Hoa Industrial Zone, Me Linh district, Vinh Phuc Province.
4 Capacity: 450,000 bias/year and 600,000 radial/year
5 Production and/or services:  Producing and doing business of Automotive Tire and related products
6 Market: For domestic market and export (15% bias and 50% radial)
7 Main technology: Using updated technology
8 Employment: 620 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: $59 million Legal capital: $18 million

PROJECT NO. 49 (Back to Table of Contents)

1 Name of Project: Urea Project No.2
2 Objective: Building a Urea Plant
3 Location: North of Vietnam (Thai Binh Province)
4 Capacity: 1,500 MT/year of NH3; 600 MT/year of urea
5 Production and/or services: Producing and doing business of urea, explosive related products
6 Market : For domestic market
7 Main technology: Using the modern technology for processing natural gas as feedstock
8 Employment: about 450 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: $400 million

PROJECT NO. 48 (Back to Table of Contents)

1 Name of Project: Phu My Urea Project
2 Objective: Building a Urea Plant
3 Location: Phu My Village, Tan Thanh District, Ba Ria-Vung Tau Province
4 Capacity: 1,350 MTY of NH3; 2200-2400 MTYof Urea (about 700.000 MTY of Urea)
5 Production and/or services: Producing and doing business of urea and ammonium (NH3)
6 Market : For domestic fertilizer market
7 Main technology Using the technology from Snamprogetti of urea and Haldor Topsoe of ammonium
8 Employment: about 200 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: Total capital: Max.: $534 million; Min.: $500 million Legal capital: $160 million

FORESTRY 5 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 164 (Back to Table of Contents)

1 Name of Project: Afforestation and manufacture of pulp and paper in Kon Tum
2 Objectives: - Afforestation and supply of wood material for processing paper factory; - Provide jobs for local inhabitants; - Environmental protection.
3 Location: Kon Tum province
4 Capacity: - Planting 50,000 ha of material area for the Mill - Processing of pulp and paper: 100,000 tonnes per year
5 Market: For domestic and export demands
6 Main technology: Up-dated technology for wood processing
7 Employment:
8 Investment Form : Joint-venture
9 Investment capital: - For plantation: $ 40-50 million - For paper factory: $ 60 million
10. For plantation: $ 40-50 million - For paper factory: $ 60 million

PROJECT NO. 164 B (Back to Table of Contents)

1 Name of Project: Afforestation and manufacture of pulp and paper
2 Objectives: - Afforestation and supply of material for pulp and paper processing factory; - Provide jobs for local inhabitants; - Environmental protection.
3 Location: Nghe An province
4 Capacity: - Planting 30,000 ha with intensive measure for higher yield supplying raw material to the Mill - Processing of pulp and paper: 50,000 - 60,000 tons/year
5 Market: For domestic and export demand
6 Main technology: Up-dated technology in pulp and paper processing
7 Employment:
8 Investment Form: Join-venture
9 Investment capital: - For planting: $ 30 - 40 million - For pulp and paper: $ 40 million

PROJECT NO. 166A (Back to Table of Contents)

1 Name of Project: Afforestation and manufacture of MDF (middle direct fireboat) Mill project
2 Objectives: - Afforestation and supply of wood processing factory; - Provide jobs for local inhabitants; - Environmental protection.
3 Location: Binh Thuan province
4 Technical criteria:
5 Project related documentary
6 Investment Form
7 Investment capital:
8 Information on Vietnamese Party
9 Timing

PROJECT NO. 166B (Back to Table of Contents)

1 Name of Project: Afforestation and manufacture of MDF (middle direct fireboat) Mill in Son La
2 Objectives: - Afforestation and supply of wood processing factory; - Provide jobs for local inhabitants; - Environmental protection.
3 Location: Son La province
4 Capacity: - Planting 30,000 ha with intensive measures for higher yield supplying raw material to MDF the Mill; - Processing 50,000 - 60,000 tonnes of MDF per year.
5 Market: For domestic and export demands
6 Investment Form Joint- Venture or Business Co-operation Contract
7 Investment capital: - Plantation: $ 30-40 million - Paper processing factory: $ 20-25 mil.

PROJECT NO. 168 (Back to Table of Contents)

1 Name of Project: Forest tree seed production in new technology
2 Objectives: - Supply of forest tree seed for plantation 5 million ha program; - Provision of genetically suitable of good physiological quality.
3 Location: Phu Tho province
4 Capacity:
5 Market: For 5 million ha of afforestation program
6 Investment Form Joint- Venture or Business Co-operation Contract
7 Investment capital: - Building a forest tree seeding centre: 5-10 million

PAPER 3 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 72 (Back to Table of Contents)

1 Name of Project: Kontum Pulp Mill
2 Objective: Establishment of the Pulp Mill
3 Location: Kontum Province
4 Capacity: 100,000 tones/year
5 Production and/or services: Pulp
6 Market : Domestic consumption
7 Main technology: Modern technology with chemical recovery
8 Employment: 1,000 persons
9 Investnt form: Credit contract or joint venture
10 Proposed Investment Capital: $150 million
11 Information on Vietnamese Party: - Name: Vietnam Paper Corporation (VINAPIMEX) - Address: 25 A Ly Thuong Kiet Str. Hanoi - Tel: (84.4) 8 247773 - Fax: (84.4) 8 260381 - Representative: Mr. Phan Quy Ky-General Director - Ownership form: State owned enterprise - Main line of business: Prod

PROJECT NO. 73 (Back to Table of Contents)

1 Name of Project: Thanh Hoa Paper Mill
2 Objective: Establishment of the Pulp Mill
3 Location: Thanh Hoa Province
4 Capacity: 50,000 tones/year
5 Production and/or services: Industrial packaging paper
6 Market : Domestic consumption
7 Main technology: Sulfate process with chemical recovery
8 Employment: 850 persons
9 Investment form: Joint-venture
10 Proposed Investment Capital: $125 million

PROJECT NO. 74 (Back to Table of Contents)

1 Name of Project: Upgrade and expansion of Dong Nai Paper Company
2 Objective: Upgrade and expansion of Dong Nai Paper Company
3 Location: Dong Nai Province
4 Capacity: Existing: 100,000 tones/year After investment: 400,000 tones/year
5 Production and/or services: Printing paper, writing paper and wrapping paper
6 Market : Domestic consumption and export
7 Main technology: Sulfate process with chemical recovery
8 Employment: 1,000 persons
9 Investment form: Credit contract, Joint-venture
10 Proposed Investment Capital: $22 million

PHARMACEUTICAL INDUSTRY AND MEDICAL EQUIPMENT 9 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 78 (Back to Table of Contents)

1 Name of Project: Improvement and upgrading of traditional medicinal line.
2 Objective: Improving and upgrading the existing traditional medicinal line in order to produce traditional medicinal products of high quality.
3 Location: Haiphong
4 Output 450 tones products/year
5 Production and/or services: - Pills: 200 tones/year - Granulates: 100tones/year - Herbal teas: 50 tones/year - Balms: 100 millions boxes/year - Liquid balms: 100.000 liters/year
6 Market : In Vietnam mainly and export
7 Main technology: The new licenses, modern technical know-how will be imported
8 Employment: 150 staff
9 Investment form: Joint-venture
10 Proposed Investment Capital: $ 3 million

PROJECT NO. 79 (Back to Table of Contents)

1 Name of Project: Improvement and upgrading of traditional medicinal line.
2 Objective: Improving and upgrading the existing traditional medicinal line in order to produce traditional medicinal products of high quality.
3 Location: Ho Chi Minh City
4 Output 600 tones products/year
5 Production and/or services: - Pills: 250 tones/year - Granulates: 150tones/year - Herbal teas: 100 tones/year - Balms: 100 millions boxes/year - Liquid balms: 100.000 liters/year
6 Market : In Vietnam mainly and export
7 Main technology: The new licenses, modern technical know-how will be imported
8 Employment: 150 staff
9 Investment form: Joint-venture
10 Proposed Investment Capital: $ 4 million

PROJECT NO. 80 (Back to Table of Contents)

1 Name of Project: Surgical suture catgut Production Plant
2 Objective: Medical equipment
3 Location: Hanoi city
4 Output 5,000,000m catgut/year
5 Production and/or services: Production of different sugical suture catgut: Plain, chromic, and micro surgical suture...
6 Market : 800 central, local and provincial and district
7 Main technology: Up to date technology
8 Employment: Above 100 employees
9 Investment form: Business Cooperation Contract
10 Proposed Investment Capital: Total capital above $450 million Legal capital above $ 150 million

PROJECT NO. 81 (Back to Table of Contents)

1 Name of Project: Medical Rubber Instrument Single Use
2 Objective: Production for domestic market and export: Medical catheters, bags, surgical gloves, examining gloves...
3 Location: Northern of Hanoi (Socson district)
4 Capacity: 1.000.000 catheters, 20 million gloves/per year
5 Production and/or services: Production
6 Market : Domestic and export
7 Main technology: Powder-free gloves, gamma-sterilization
8 Employment: 100 employees
9 Investment form: Joint-venture
10 Proposed Investment Capital: In the 1st step: $ 2 million

PROJECT NO. 82 (Back to Table of Contents)

1 Name of Project: Vi Polysaccharide Typhoid vaccine production
2 Objective: To apply transferred advanced technology to produce enough Vi Polysaccharide Typhoid Vaccine met the WHO quality standard for the National Expanded Immunization Program and exports for 2000s.
3 Location:
4 Capacity:
5 Production and/or services:
6 Market :
7 Main technology:
8 Employment:
9 Investment form:
10 Proposed Investment Capital: $ 3 million (from ODA)

PROJECT NO. 83 (Back to Table of Contents)

1 Name of Project: To renew the machinery system that is now out of date and inappropriate for the local production of BCG vaccine.
2 Objective: To change some important machines and equipment that are too old to meet GMP demand (20-30 years ago) such as : Freeze-dryer machine, Ampoule sealing machine. Ampoule washing system, Filling machine, Autoclave, Drying stove and other vital accessories
3 Location:
4 Capacity:
5 Production and/or services:
6 Market :
7 Proposed Investment Capital: Foreign currency: $ 3-4 million Local currency: 2-3 billion VND
8 Investment form:
9 Duration:

PROJECT NO. 84 (Back to Table of Contents)

1 Name of Project: Pharmaceutical Formulation Plant meets GMP
2 Objective: To establish Plant meets GMP in order to produce tablets injection, antibiotic products....having high technological quality.
3 Location: Hanoi
4 Capacity: With the turnover about $40 million per year
5 Production and/or services: Production: - Injection ampoule: 100 million/year - Intravenous Infusion bottle: 5 million/year - Antibiotic capsules and tablets: 2 billion/year - Other tablets: 2 billion/year - Ointments and Cream: 10 tones/year - Aerosol, spray: 10 million bottle/ year
6 Market : In Vietnam mainly
7 Main technology: The new licenses, modern technical know-how will be imported
8 Employment: 250-300 staff
9 Investment form: Joint-venture
10 Proposed Investment Capital: $ 25-30 million

PROJECT NO. 85 (Back to Table of Contents)

1 Name of Project: Semi-synthetic antibiotic plant
2 Objective: To establish new plant in order to produce raw material antibiotic
3 Location: Hanoi
4 Capacity: 500 tones/year
5 Production and/or services: Penicillin and derivatives from Penicillin: 6.APA; 7. ADCA and new generation products of Cephalosporin
6 Market : In Vietnam mainly
7 Main technology: The new licenses, modern technical know-how will be imported.
8 Employment: 200 staff
9 Investment form: Joint-venture
10 Proposed Investment Capital: $50 million

PROJECT NO. 86 (Back to Table of Contents)

1 Name of Project: Multi-chemico Pharmaceutical Plant
2 Objective: To establish new plant in order to produce raw material of various chemical pharmaceutical and excipients.
3 Location: Hanoi
4 Capacity: 600 tones raw material/year
5 Production and/or services: Produce: - Analgesics, antipyreties: 100 tones/year - Anti-bacteria powders: 70 tones/ year - Anti-helminthics: 20 tones/ year - Cardiovascular: 10 tones/ year - Vitamins: 200 tones/ year - Excipients: 200 tones/ year
6 Market : In Vietnam mainly
7 Main technology: The new licenses, modern technical know-how will be imported
8 Employment: 360 staff
9 Investment form: Joint-venture
10 Proposed Investment Capital: $ 20 million

STEEL 2 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 58 (Back to Table of Contents)

1 Name of Project: Integrated Steel Mill
2 Objective: - 1st step: Setting up Hot and Cold rolling plant with capacity: 1.55 MT/year hot strip and 0.6 MT/year cold strip Slab import: 1.68 MT/year Construction schedule: from mid 2002 to mid 2005. - 2nd step: Setting up blast furnace plant No. 1 with capacity:
3 Location: Nghe Tinh (Mui Ron) or Dung Quat
4 Capacity:
5 Production and/or services: Product specification: Thickness: 1.2-1.79 mm x width 650-1300 and 1600mm 1.8-5.99 mm 6.0-15.99 mm 16-32 mm
6 Market : meet 100% demand of steel sheet and plate in Vietnam at the time the mill starts to produce and export
7 Main technology: Blash furnace-Basic Oxygen furnace-Continuous casting-Hot strip/Cold strip rolling-Galvanizing and tinning
8 Employment: During construction: 10,000 persons During production: 6,500 person
9 Investment form: Joint-venture or Business Cooperation contract
10 Proposed Investment Capital: Total capital: $5,827 million - Equipment: $3,091 million - Construction: $1,202 million - Other cost: $1,377 million - Contingency: $157 million

PROJECT NO. 59 (Back to Table of Contents)

1 Name of Project: Special Steel Plant
2 Objective: To establish a steel plant to produce special steel for mechanical manufacturing industry
3 Location: Hai Phong city or suburban of Hanoi
4 Capacity: 30,000 tones/year at the first time of operating Expansion step by step: 45,000 - 75,000 - 100,000 tones/year
5 Production and/or services: - By grades: High carbon steel, low-alloy steel, tools steel, spring steel, free-cutting steel, bearing steel, stainless steel... - By size: Round bars from 25-80mm Flats bars from 6-16 x 50- 100mm Square billets up to 130 mm Small ingots for forging.
6 Market : Domestic
7 Main technology: EAF/LF/VOD-continuous/ingots Casting-Bar mill
8 Employment: 431 persons (with max. capacity)
9 Investment form: joint-venture
10 Proposed Investment Capital:

TELECOMMUNICATION 3 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 190 (Back to Table of Contents)

1 Name of Project: Paging
2 Objective: Develop the paging services using the cellular infrastructure network
3 Location: Ho Chi Minh, Tay Ninh, Dong Nai, Binh Duong, Ba Ria-Vung Tau, other provinces of Mekong Delta
4 Capacity: 220,000 subscribers
5 Production and/or services: Paging services
6 Market : Annual installation of 40,000 subscribers
7 Main technology: Rlex, Reflex
8 Employment:
9 Investment form: Business Cooperation Contract
10 Proposed Investment Capital: $8 million

PROJECT NO. 191 (Back to Table of Contents)

1 Name of Project: Develop the software
2 Objective: Produce the software for Information and Telecommunication technology
3 Location: Ho Chi Minh City
4 Capacity:
5 Production and/or services: Application software for Information and Telecommunication Technology
6 Market : Software for domestic demand and export
7 Main technology: Updated technology
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital: $1.5 million

PROJECT NO. 192 (Back to Table of Contents)

1 Name of Project: Manufacture SKD Telecommunication Equipment
2 Objective: Produce the Terminal Equipment
3 Location Ho Chi Minh City
4 Capacity: Â 4 Capacity: Â
5 Production and/or services: Telecommunication Equipment
6 Market : Terminal CDMA equipment, etc. for domestic network and export.
7 Main technology: Updated Technology
8 Employment:
9 Investment form: Joint-venture
10 Proposed Investment Capital: $8 million

PROJECT NO. 189 (Back to Table of Contents)

1 Name of Project: Vietnam Communication Satellite (VINASAT)
2 Objective: Establish the Communication Satellite Network
3 Location: Lauch the Satellite into Geostationary Orbit, establish the Earth Station.
4 Capacity: 20-30 transponders
5 Production and/or services: Provide Communication Satellite Services
6 Market : Communication services for telecommunication, Mass-media, Broadcasting, Meteorology,....
7 Main technology: Updated Satellite Technology
8 Employment:
9 Investment form: Business Cooperation Contract
10 Proposed Investment Capital: $350 million

TOURISM-SERVICES 4 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 200 (Back to Table of Contents)

1 Name of Project: Bai chay-Quang Ninh Park
2 Objectives: Construction of the modern park including variuos forms of entertainment
3 Location: Quang Ninh province
4 Specification - Land area: 20,000 m2. - Infrastructure in good condition
5 Production: Various form of entertainment (excepting casino)
6 Market: For Vietnamese and foreigners
7 Employment: 200 Employees
8 Investment Form : Joint- venture
9 Investment capital: - Total capital: US$ 50 million - Legal capital: US$ 20 million
10 Duration 40 years

PROJECT NO. 204 (Back to Table of Contents)

1 Name of Project: Da Nang Tourist Park
2 Objectives: Construction of the modern park in Da Nang city
3 Location: Da Nang city
4 Specification Land area: 150 ha
5 Services All of tourist services
6 Market: For Vietnamese and foreigners
7 Employment: 200 employees
8 Investment Form : Joint- venture
9 Investment capital: - Total capital: $ 30 million - Legal capital: $ 10 million
10 Duration 30 years

PROJECT NO. 205 (Back to Table of Contents)

1 Name of Project: Son Dao- Thuy Nguyen (Hai Phong) culture and sport centre
2 Objectives: Establishing a entertainment zone including: sport club, culture operation, 3-star- internaltional- hotel with 100 - 160 rooms.
3 Location: Hai Phong city
4 Specification Land area: 299.3 ha. Infrastructure does not meet the present requirements
5 Services Hotel, sport, Entertainment services
6 Market: Vietnamese and foreigners
7 Employment: 1,500 employess
8 Investment Form : Joint - Venture
9 Investment capital: - Total capital: $ 35 million - Legal capital: $ 25 million
10 Duration 30 years

PROJECT NO. 209 (Back to Table of Contents)

1 Name of Project: Mining Mineral water and natural tourist
2 Objectives: Mining and producing Mineral water, establishing a natural preservation zone and business tour services
3 Location: Dong Nai province
4 Specification Land area: 13,31 ha (including 12,19 ha of forest), natural hot water mine with many caves, waterfalls
5 Services Natural tour and other services
6 Market: For Vietnamese and Foreigner
7 Employment: 60 Employees
8 Investment Form : Joint - Venture
9 Investment capital: - Total capital: $ 10 million - Legal capital: $ 3 million
10 Duration 30 year

TRANSPORTATION 11 PROJECTS
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com

PROJECT NO. 178 (Back to Table of Contents)

1 Name of Project: Railway (on road or underground) in Hanoi
2 Objectives: Construction the railway over road or underground for public transportation in order to resolve traffic overload problem in Hanoi
3 Location: Hanoi city
4 Technical criteria: - From Gia Lam to Giap Bat : National Railway Standard; - From Hanoi Station to national belt roads (underground or over road)
5 Project related documentary Feasibility study (F/S) is undertaking
6 Investment Form BOT
7 Investment capital: Estimated capital : $ : 6,000 million
9 Timing The year 2000

PROJECT NO. 179 (Back to Table of Contents)

1 Name of Project: East - West Railway
2 Objectives: Reinforce and up-grade the railway East- West for public transportation.
3 Location: Railway connecting Lao Cai- Ha noi (Yen Vien)-Quang Ninh- Cai Lan
4 Technical criteria: Reinforcement & up-grading 600 km long railway with National railway standard of 1m wide
5 Project related documentary F/S is ready
6 Investment Form BOT
7 Investment capital: Estimated capital: US& 130 million
9 Timing

PROJECT NO. 180 (Back to Table of Contents)

1 Name of Project: Hanoi belt roads
2 Objectives: Construction a belt road system in Ha noi for resolving traffic jam problem
3 Location: Ha noi : Nam Thang Long- Mai Dich- Phap Van- Sai Dong- Cau Duong-Duong Yen- Noi Bai
4 Technical criteria: Length: 50km highway long with 4-8 lanes (first stage)
5 Project related documentary
6 Investment Form BOT
7 Investment capital: UD$ 600 million

PROJECT NO. 181 (Back to Table of Contents)

1 Name of Project: Ho Chi Minh city - Vung Tau Highway
2 Objectives: Construction the Highway from HCM city to Vung Tau
3 Location: From Thu Thiem bridge through Long Thanh to Vung Tau
4 Technical criteria: Length: Highway of 59km long with 2 bridges of 1000m & 200m long Width: 28 - 30 m wide with 6-8 lanes
5 Project related documentary Feasibility study (FS)
6 Investment Form BOT
7 Investment capital: Estimated capital : $ : 620 million

PROJECT NO. 182 (Back to Table of Contents)

1 Name of Project: Highway 13 (from Binh Phuoc to Ben Cat-Binh Duong province)
2 Objectives: Widen and upgrade to meet the transportation need of the area.
3 Location: Highway 13 (part in Binh Duong province only)
4 Tectonic criteria: 40 km long,standard of grade 3 for delta area (VN standard)
5 Project related documentary feasibility study is being undertaken
6 Investment Form BOT
7 Investment capital: $80 million

PROJECT NO. 183 (Back to Table of Contents)

1 Name of Project: Highway 14 from Ngoc Hoi to Thanh My -Quang Nam province
2 Objectives: Construction 140 km on Highway 14 in Quang Nam province
3 Location: Quang Nam province
4 Technical criteria: Length: 140 km Standard: Class 3 for mountainous area (Vietnamese standard)
5 Project related documentary Feasibility study (F/S)
6 Investment Form BOT
7 Investment capital: Estimated capital : $30 million

PROJECT NO. 184 (Back to Table of Contents)

1 Name of Project: Highway 18 from Cua On to Bac Luan
2 Objectives: Connecting economic tangle Hanoi - Haiphong-Quang Ninh
3 Location: Highway 18 through Quang Ninh province from Cua Ong to Bac Luan
4 Technical criteria: Length: 130km long with 3rd grade for mountainous area (VN standard)
5 Project related documentary Feasibility study (FS)
6 Investment Form BOT
7 Investment capital: Estimated capital: $ 150 million

PROJECT NO. 185 (Back to Table of Contents)

1 Name of Project: Highway 38 (including Yen Lenh bridge)
2 Objectives: - Reinforce and up-grade Highway 38 lingking Bac Ninh-Hai Duong- Thai Binh, connecting Highway 1 to Highway 10. - Construct a new Yen Lenh bridge
3 Location: Highway 38 through Hung Yen province
4 Technical criteria: Road: 60 km Highway long with standard of grade 2 for delta area (VN standard) Bridge: 1200m long, 12m wide, 2 lanes with standard of H30-XB80 (VN standard)
5 Project related documentary Feasibility study is undertaken
6 Investment Form BOT
7 Investment capital: For Highway: $ 37 million For bridge: $ 35 million

PROJECT NO. 186 (Back to Table of Contents)

1 Name of Project: Thu Thiem Bridge
2 Objectives: Build the bridge to connect Thu thiem with Hochiminh city to prepare for a new urban to be built.
3 Location: Over Saigon river , belong to Ton Duc Thang road, HCMC
4 Technic criteria: 6 lanes bridge
5 Project related documentary F/S , documents related to P.F/S
6 Investment Form BOT
7 Investment capital: 120 -300 Million USD ( depends on the alternative to be chosen)
9 Timing by the year 2000

PROJECT NO. 187 (Back to Table of Contents)

1 Name of Project: Binh Phuoc Bridge
2 Objectives: Construction the Binh Phuoc bridge
3 Location: Ho Chi Minh city
4 Technical criteria: Length: 400m Standard: H30-XB80 (VN standard)
5 Project related documentary F/S and other related documentary are available
6 Investment Form BOT
7 Investment capital: $ 20 million
9 Timing by the year 2,000

PROJECT NO. 188 (Back to Table of Contents)

1 Name of Project: Ha Nha Bridge on Highway 14B
2 Objectives: Construction Ha Nha Bridge on Highway 14B in Quang Nam
3 Location: Quang Nam province
4 Technical criteria: Length: 360m Width: 11m with 2 lanes highway
5 Project related documentary All documentary related to the project
6 Investment Form BOT
7 Investment capital: Estimated capital : $3million

For more information please contact us :
Tel:(416) 789 5103 Fax:(416) 789 3561 E-mail:seaiba@hotmail.com
(Back to Table of Contents)